Sunday, July 22, 2007

Sock-it-to-me Sunday

I didn't make much progress on the socks although I am about to do the heel flap for Cascading Leaves 1 and have made some progress on the second Jaywalker. The second one seems to not be striping as well as the first one. No biggie. I think it will look great no matter what. It looks like the colors are swirling so far. The plan for the Cascading Leaves is to do the leg of each sock, then the heel flap, etc. That way I will be wrapping both socks up at about the same time. Then I really need to start on a pair for the Chief. His birthday is next month.

0 Daffodils planted: